Tech­ni­cal Due Dili­gence and per­for­mance analysis for 51

Green­tech performs an annual due dili­gence inspec­tion of this plant with the aim to review the tech­ni­cal con­sti­tu­ti­on and safety. At the same time, the services of the O&M provider are being analysed with regard to the con­trac­tu­al scope, response times and manufacturer-compliant main­ten­an­ce. Addi­tio­nal DC and AC mea­su­rements form a com­pre­hen­si­ve service package. The results are being docu­men­ted with TabTool PV and together with recom­men­da­ti­ons pre­sen­ted to the client. The moni­to­ring of rec­tifi­ca­ti­on works or veri­fi­ca­ti­on of open issues is managed by green­tech as well.

Addi­tio­nal­ly, green­tech has instal­led an inde­pen­dent sensor station on-site which is the basis for a monthly target – actual com­pa­ri­son, showing a detailed analysis and eva­lua­ti­on of the plant per­for­mance. The report iden­ti­fies short-term losses but also gradual degra­da­ti­on in order to act quickly with cor­rec­tive actions.

Location:  Ahlhorn, Germany
Com­mis­sio­ning:  June 2012
Rated power: 51.410 kWp
Modules:  Canadian Solar & Sun Earth
Inverter: Power One PVI 55 & Voltwerk VC 300

Customer opinion

» When it comes to tech­ni­cal O&M services, we rely on trusted and long-standing partners with a strong focus on inde­pen­den­cy and quality. The PV-expert green­tech complies exactly with our requi­re­ments. «

Detlef Schrei­ber, Managing Director, CEE Manage­ment GmbH

www.cee-holding.de/