{"id":56328,"date":"2025-08-27T15:21:15","date_gmt":"2025-08-27T13:21:15","guid":{"rendered":"https:\/\/greentech.energy\/?post_type=linkedin-post&#038;p=56328"},"modified":"2025-08-27T15:21:15","modified_gmt":"2025-08-27T13:21:15","slug":"inbetriebnahme-schulzendorf-und-sternebeck","status":"publish","type":"linkedin-post","link":"https:\/\/greentech.energy\/en\/linkedin-post\/inbetriebnahme-schulzendorf-und-sternebeck\/","title":{"rendered":"Inbetriebnahme Schulzendorf und Sternebeck"},"excerpt":{"rendered":"<p>With the successful commissioning of the Schulzendorf and Sternebeck solar parks, we have connected two further projects to the grid for our client Trianel \u2013 a total of around 36 MWp of new solar capacity in Brandenburg. Over the past few months, around 50,000 modules, 110 inverters and 6 transformer stations have been installed at both plants. As EPC partner, we were responsible for the entire construction process, including planning and procurement. And the plants will remain in the \u2018greentech family\u2019 \u2013 our colleagues from O&#038;M are taking over operational management in the future.<\/p>\n","protected":false},"featured_media":56329,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"_links_to":"","_links_to_target":""},"class_list":["post-56328","linkedin-post","type-linkedin-post","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/linkedin-post\/56328","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/linkedin-post"}],"about":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/types\/linkedin-post"}],"version-history":[{"count":1,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/linkedin-post\/56328\/revisions"}],"predecessor-version":[{"id":56337,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/linkedin-post\/56328\/revisions\/56337"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media\/56329"}],"wp:attachment":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media?parent=56328"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}