{"id":30486,"date":"2022-04-22T10:55:08","date_gmt":"2022-04-22T08:55:08","guid":{"rendered":"https:\/\/greentech.energy\/greentech-bietet-machbarkeitsstudie-fuer-pv-aufdachanlagen\/"},"modified":"2025-05-01T19:52:30","modified_gmt":"2025-05-01T17:52:30","slug":"greentech-offers-feasibility-study-for-rooftop-pv-systems","status":"publish","type":"post","link":"https:\/\/greentech.energy\/en\/greentech-offers-feasibility-study-for-rooftop-pv-systems\/","title":{"rendered":"greentech offers feasibility analysis for rooftop PV systems"},"content":{"rendered":"<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<p><em>Hamburg, April 22nd, 2022<\/em>\u00a0\u2013 The PV specialist\u00a0<a href=\"https:\/\/greentech.energy\/en\/\">greentech<\/a>\u00a0recently started offering\u00a0feasibility analyses\u00a0for the technical and economic realisation of rooftop PV systems. The experts of greentech, headquartered in Hamburg, assess the characteristics of the available roof area and the possibility of electrical integration of the PV system into the building.<\/p>\n<p>In addition to\u00a0<a href=\"https:\/\/enduringplanet.com\/insights\/grants-for-climate-change-projects\"><span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;grants climate change&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:1325827,&quot;3&quot;:{&quot;1&quot;:0},&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:16777215},&quot;11&quot;:0,&quot;12&quot;:0,&quot;14&quot;:{&quot;1&quot;:2,&quot;2&quot;:0},&quot;15&quot;:&quot;Arial&quot;,&quot;16&quot;:10,&quot;21&quot;:0,&quot;23&quot;:2}\">grants for climate change<\/span><\/a><span data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;grants for climate change projects&quot;}\" data-sheets-userformat=\"{&quot;2&quot;:1325827,&quot;3&quot;:{&quot;1&quot;:0},&quot;4&quot;:{&quot;1&quot;:2,&quot;2&quot;:13228792},&quot;11&quot;:0,&quot;12&quot;:0,&quot;14&quot;:{&quot;1&quot;:2,&quot;2&quot;:0},&quot;15&quot;:&quot;Arial&quot;,&quot;16&quot;:10,&quot;21&quot;:0,&quot;23&quot;:2}\">\u00a0projects and proven\u00a0<\/span>plant designs individually developed and optimised for the respective roof, the client also receives estimates of the PV plant\u2019s energy production, anticipated CO<sub>2<\/sub>\u00a0savings and the expected economic payback period.<\/p>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<div class=\"post-content\">\n<section class=\"wpb-content-wrapper\">\n<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<p><strong>Rooftop PV systems increasingly a legal obligation<\/strong><\/p>\n<p>The offer applies to both new buildings and existing buildings. \u201cSeveral federal states in Germany have moved to make the implementation of a PV system on the roof a legal requirement when building new properties,\u201d says Johannes Liebich, Head of Engineering and Technical Advisory at greentech. \u201cMany building owners, but also architects, now have to include a PV system in their property development right away \u2013 preferably in such a way that it is integrated into the building as an integral part from the start and implemented in such a way that it can generate as much yield as possible.\u201d<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Reduce electricity costs and pursue sustainability goals at the same time<\/strong><\/p>\n<p>It can also be interesting to know how much electricity can be produced with a PV system on the roof of an already existing building: \u201cIncreasingly, companies are considering installing PV systems on the roofs of their office buildings, production halls or warehouses to save electricity costs in the long term and to sustainably reduce their CO<sub>2<\/sub>\u00a0contribution,\u201d says the experienced engineer. In this context, the additional implementation of storage solutions is also becoming increasingly attractive: The produced electricity can be used either immediately or at a later time \u2013 thus the power supply of the building can become largely independent from rising electricity prices. Other owners prefer to lease their roof areas to external investors and operators. \u201cWe provide all interested parties with reliable figures, so they can make their investment decision and enter into further detailed planning. Along the next steps we support our customers as well during the tender process, construction, and commissioning support and of course during the operations phase,\u201d says Liebich.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>The greentech feasibility analysis provides information on, among other things<\/strong><\/p>\n<ul>\n<li><strong>whether a roof area is suitable for a PV system,<\/strong><\/li>\n<li><strong>what size of system is possible and how much electricity could be generated annually,<\/strong><\/li>\n<li><strong>what investment costs should be expected,<\/strong><\/li>\n<li><strong>how high the system\u2019s electricity production costs are,<\/strong><\/li>\n<li><strong>how much of the previous electricity consumption can be compensated by the system, and<\/strong><\/li>\n<li><strong>how much CO<sub>2<\/sub>\u00a0savings can be generated by the system.<\/strong><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\">\n<p><strong>press contact<\/strong><br \/>\ngreentech<br \/>\nAnika Wist<br \/>\nWarburgstra\u00dfe 50<br \/>\n20354 Hamburg<br \/>\n+49 (40) 8060 6694 0<br \/>\na.wist@greentech.energy<br \/>\n<a href=\"https:\/\/greentech.energy\/en\/\" target=\"_blank\" rel=\"noopener\">www.greentech.energy<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"vc_row wpb_row vc_row-fluid\">\n<div class=\"wpb_column vc_column_container vc_col-sm-12\">\n<div class=\"vc_column-inner\">\n<div class=\"wpb_wrapper\">\n<div class=\"wpb_text_column wpb_content_element \">\n<div class=\"wpb_wrapper\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hamburg, April 22nd, 2022\u00a0\u2013 The PV specialist\u00a0greentech\u00a0recently started offering\u00a0feasibility analyses\u00a0for the technical and economic realisation of rooftop PV systems. The experts of greentech, headquartered in Hamburg, assess the characteristics of the available roof area and the possibility of electrical integration of the PV system into the building. In addition to\u00a0grants for climate change\u00a0projects and proven\u00a0plant [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":30476,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[49],"tags":[],"class_list":["post-30486","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/30486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/comments?post=30486"}],"version-history":[{"count":2,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/30486\/revisions"}],"predecessor-version":[{"id":50868,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/30486\/revisions\/50868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media\/30476"}],"wp:attachment":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media?parent=30486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/categories?post=30486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/tags?post=30486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}