{"id":44276,"date":"2024-05-06T08:33:50","date_gmt":"2024-05-06T06:33:50","guid":{"rendered":"https:\/\/greentech.energy\/?p=44276"},"modified":"2024-05-06T10:03:16","modified_gmt":"2024-05-06T08:03:16","slug":"greentech-commissions-11-mwp-solar-plant-grossheirath-ii","status":"publish","type":"post","link":"https:\/\/greentech.energy\/en\/greentech-commissions-11-mwp-solar-plant-grossheirath-ii\/","title":{"rendered":"greentech commissions 11 MWp solar plant \u2018Gro\u00dfheirath II\u2019"},"content":{"rendered":"<p>Hamburg, 02.05.2024 &#8211; Together with landowner Wolfgang Schulthei\u00df and Kilian Schmierer, Business Banking Consultant at Ihre Volksbank eG Neckar Odenwald Main Tauber, the Hamburg-based solar specialist greentech recently commissioned the \u2018Gro\u00dfheirath II\u2019 solar plant after just 10 weeks of construction and connected it to the S\u00dcC Coburg grid. The power plant developed by Wolfgang Schulthei\u00df and greentech and constructed by greentech is located in the immediate vicinity of another greentech plant that has been supplying the region with renewable energy since last autumn. The neighbourhood also made the grid connection much easier, as the route to the substation in Se\u00dflach already exists. \u2018The collaboration was so easy and trusting that I quickly decided to lease another area to greentech,\u2019 says Wolfgang Schulthei\u00df.<\/p>\n<p>\u2018We are delighted to be able to commission another plant here in the region of Coburg so quickly, which we are going to manage in the long term beyond the construction phase,\u2019 says Fabian Wany, Head of Project Realisation at greentech, because greentech is also taking over the technical and commercial management of this solar power plant.<\/p>\n<p>The EEG-subsidised plant will supply around 1,150 single-family homes (with 4,000 kWh electricity consumption per year) with green electricity. It is located on an agriculturally disadvantaged area. In order to promote biodiversity on the site, herb-rich meadows with organic seed will be sown under and between the PV modules. In addition, flowering strips, deadwood and piles of stones will be created. A 3-row hedge ensures that the solar park integrates well into the landscape.<\/p>\n<p><strong>Press contact<\/strong><\/p>\n<p>Lena Konopko<br \/>\nCoporate Communications<br \/>\nWarburgstra\u00dfe 50<br \/>\n20354 Hamburg<\/p>\n<p>E-Mail: presse@greentech.energy<br \/>\nTelephone: <span class=\"TextRun SCXW140467087 BCX2\" lang=\"IT-IT\" xml:lang=\"IT-IT\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW140467087 BCX2\">+49 40 743251-296<\/span><\/span><\/p>\n<p>We are always available for press enquiries of any kind as well as statement and interview requests.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Hamburg, 02.05.2024 &#8211; Together with landowner Wolfgang Schulthei\u00df and Kilian Schmierer, Business Banking Consultant at Ihre Volksbank eG Neckar Odenwald Main Tauber, the Hamburg-based solar specialist greentech recently commissioned the \u2018Gro\u00dfheirath II\u2019 solar plant after just 10 weeks of construction and connected it to the S\u00dcC Coburg grid. The power plant developed by Wolfgang Schulthei\u00df [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":44271,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"Hamburg, 02.05.2024 - Together with landowner Wolfgang Schulthei\u00df and Kilian Schmierer, Business Banking Consultant at Ihre Volksbank eG Neckar Odenwald Main Tauber, the Hamburg-based solar specialist greentech recently commissioned the \u2018Gro\u00dfheirath II\u2019 solar plant after just 10 weeks of construction and connected it to the S\u00dcC Coburg grid. The power plant developed by Wolfgang Schulthei\u00df and greentech and constructed by greentech is located in the immediate vicinity of another greentech plant that has been supplying the region with renewable energy since last autumn. The neighbourhood also made the grid connection much easier, as the route to the substation in Se\u00dflach already exists. \u2018The collaboration was so easy and trusting that I quickly decided to lease another area to greentech,\u2019 says Wolfgang Schulthei\u00df.\r\n\r\n\u2018We are delighted to be able to commission another plant here in the region of Coburg so quickly, which we are going to manage in the long term beyond the construction phase,\u2019 says Fabian Wany, Head of Project Realisation at greentech. Because greentech is also taking over the technical and commercial management of this solar power plant.\r\n\r\nThe EEG-subsidised plant will supply around 1,150 single-family homes (with 4,000 kWh electricity consumption per year) with green electricity. It is located on an agriculturally disadvantaged area. In order to promote biodiversity on the site, herb-rich meadows with organic seed will be sown under and between the PV modules. In addition, flowering strips, deadwood and piles of stones will be created. A 3-row hedge ensures that the solar park integrates well into the landscape.\r\n\r\n<strong>Press contact<\/strong>\r\n\r\nLena Konopko\r\nCoporate Communications\r\nWarburgstra\u00dfe 50\r\n20354 Hamburg\r\n\r\nE-Mail: presse@greentech.energy\r\nTelephone: <span class=\"TextRun SCXW140467087 BCX2\" lang=\"IT-IT\" xml:lang=\"IT-IT\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW140467087 BCX2\">+49 40 743251-296<\/span><\/span>\r\n\r\nWe are always available for press enquiries of any kind as well as statement and interview requests.","_et_gb_content_width":"","inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[49],"tags":[],"class_list":["post-44276","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/44276","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/comments?post=44276"}],"version-history":[{"count":5,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/44276\/revisions"}],"predecessor-version":[{"id":44283,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/44276\/revisions\/44283"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media\/44271"}],"wp:attachment":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media?parent=44276"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/categories?post=44276"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/tags?post=44276"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}