{"id":50524,"date":"2025-04-29T13:35:33","date_gmt":"2025-04-29T11:35:33","guid":{"rendered":"https:\/\/o7wkziwp0p-staging.wpdns.site\/?p=50524"},"modified":"2026-10-18T20:26:08","modified_gmt":"2026-10-18T18:26:08","slug":"collaborating-for-solar-development-in-brandenburg-trianel-and-greentech-realise-pioneering-project","status":"publish","type":"post","link":"https:\/\/greentech.energy\/en\/collaborating-for-solar-development-in-brandenburg-trianel-and-greentech-realise-pioneering-project\/","title":{"rendered":"Collaborating for solar development in Brandenburg: Trianel and greentech realise pioneering project"},"content":{"rendered":"\n<div class=\"et_pb_section_0 et_pb_section et_section_regular et_block_section\"><div class=\"et_pb_row_0 et_pb_row et_pb_gutters2 et_block_row preset--module--divi-row--default\"><div class=\"et_pb_column_0 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_0 et_pb_text et_pb_bg_layout_light et_animated et_pb_module et_block_module preset--module--divi-text--default\"><div class=\"et_pb_text_inner\"><p>29 th April 2025, Aachen, Hamburg. The municipal utility cooperation Trianel has commissioned its largest solar park: In Wiesenhagen, Brandenburg, south of Berlin, Hamburg-based solar and storage specialist greentech has constructed a ground-mounted photovoltaic system with an output of 70.4 megawatt peak (MWp) for the municipal project developer in recent months. This is already the 19th plant that greentech has realised on behalf of Trianel in the last two and a half years.<\/p>\n<p>The solar park is located on a privileged 48-hectare site along the Berlin\u2013Halle railway line and comprises 100,143 Trina NEG21.C modules, each with an output of 700 to 705 watts, as well as 178 Huawei 330 KTL inverters. Ten intelligent and compact Huawei FusionSolar smart transformer stations are being used. The substructure was supplied by CWF GmbH, based in Niedernhall.<\/p>\n<p>The solar plant is connected to the grid via its own 110 kV substation owned by Trianel GmbH. The substation is located very close to the solar park, requiring just a 600-meter cable route outside the site.<\/p>\n<p>\u2018This project is a milestone in our development activities because it is the largest connected solar park that we have realised to date. It required precise planning and detailed coordination, which was only possible thanks to the excellent cooperation with greentech,\u2019 says Andreas Lemke, Head of Solar at Trianel, describing the construction activities. \u2018With this park, we have now realised ground-mounted systems with a total output of over 165 MWp in Brandenburg and can supply more than 51,000 households with climate-friendly electricity every year.\u2019\u00a0\u00a0<\/p>\n<p>\"Even the preparation phase of this project was marked by outstanding teamwork \u2013 both with our client, Trianel, and internally at greentech. Our Power Plant IT and Grid Integration departments were particularly involved in the plant design and execution \u2013 ensuring optimal results,\" says Florian Berger, Managing Director at Greentech systems GmbH.<\/p>\n<p>The entire electrical planning was also simulated and optimised using PowerFactory. This preliminary grid study made it possible to avoid significant changes after the design freeze, identify necessary measures at an early stage, and thus facilitate the certification process while eliminating unpleasant adjustments after construction began.<\/p>\n<p>In addition to Wiesenhagen, Trianel and greentech already have other joint projects in the pipeline that are to be realised during the year.<\/p>\n<\/div><\/div><\/div><\/div><div class=\"et_pb_row_1 et_pb_row et_pb_gutters2 et_block_row preset--module--divi-row--default\"><div class=\"et_pb_column_1 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_code_0 et_pb_code et_pb_module\"><div class=\"et_pb_code_inner\"><div style=\"padding:56.25% 0 0 0;position:relative;\"><iframe src=\"https:\/\/player.vimeo.com\/video\/1079767068?badge=0&autopause=0&player_id=0&app_id=58479\" frameborder=\"0\" allow=\"autoplay; fullscreen; picture-in-picture; clipboard-write; encrypted-media\" style=\"position:absolute;top:0;left:0;width:100%;height:100%;\" title=\"greentech_Wiesenhagen\"><\/iframe><\/div><script src=\"https:\/\/player.vimeo.com\/api\/player.js\"><\/script><\/div><\/div><\/div><\/div><div class=\"et_pb_row_2 et_pb_row et_pb_gutters2 et_block_row preset--module--divi-row--default\"><div class=\"et_pb_column_2 et_pb_column et_pb_column_4_4 et-last-child et_block_column et_pb_css_mix_blend_mode_passthrough\"><div class=\"et_pb_text_1 et_pb_text et_pb_bg_layout_light et_animated et_pb_module et_block_module preset--module--divi-text--default\"><div class=\"et_pb_text_inner\"><p><strong>Press contact<\/strong><\/p>\n<p>Lena Konopko<br \/>Coporate Communications<br \/>Warburgstra\u00dfe 50<br \/>20354 Hamburg<\/p>\n<p>E-Mail: presse@greentech.energy<br \/>Telephone: <span class=\"TextRun SCXW140467087 BCX2\" lang=\"IT-IT\" xml:lang=\"IT-IT\" data-contrast=\"auto\"><span class=\"NormalTextRun SCXW140467087 BCX2\">+49 40 743251-296<\/span><\/span><\/p>\n<p>We are always available for press enquiries of any kind as well as statement and interview requests.<\/p>\n<\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":11,"featured_media":50505,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[49],"tags":[],"class_list":["post-50524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-en"],"acf":[],"_links":{"self":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/50524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/comments?post=50524"}],"version-history":[{"count":13,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/50524\/revisions"}],"predecessor-version":[{"id":71323,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/posts\/50524\/revisions\/71323"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media\/50505"}],"wp:attachment":[{"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/media?parent=50524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/categories?post=50524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/greentech.energy\/en\/wp-json\/wp\/v2\/tags?post=50524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}